| Back » Home » Products » Instrumentation Tube Fittings » Superlok - Installation Instructions |
SUPERLOK - INSTALLATION INSTRUCTIONS
| 1. INSTALLATION UNDER 1 INCH OR 25MM | ||||||
SUPERLOK Tube Fittings shall be delivered to the customer completely assembled and ready for installation.
|
||||||
|
GAUGEABILITY On initial installation, the SUPERLOK Inspection Gauge assures the installer or inspector that a fitting has been sufficiently tightened. Position the SUPERLOK Inspection Gauge next to the gap between the nut and the body.
|
![]() |
| 2. INSTALLATION FOR HIGH PRESSURE OR SEVERE SERVICE SYSTEMS | ||||
Since tubing has different O.D. tolerances, it is important to have a common starting point to take out in dimensional variations. This is done by tightening the fitting slightly until the tubing can not freely rotate in the fitting as it can in the finger-tight position. At this point tighten the nut 1-1/4 turns. Safety Considerations on Installations for High Pressure System
|
||||
| 1. RE-TIGHTENING INSTRUCTIONS | ||||
|














